California Title 24, also known as the California Energy Code, sets energy efficiency standards for residential and non-residential buildings in the state. Oftentimes, customers hire us to satisfy the solar requirements for Title 24 compliance, but what they might not understand is the importance of bringing their solar subcontractor into the project earlier on.
We’ve said this before, and we’ll say it again. The sooner you bring your subcontractor into a project, the more time and money you can save. By considering this one thing from the beginning, you’ll be in a better position to complete your project on time, on budget, and with fewer complications.
If you want to work smarter and not harder to satisfy the code and get your construction permit, look no further. In this blog, we’ll break down what you need to know about Title 24’s solar requirements, and how you can get the most value from your subcontractor by avoiding common mistakes.
Simply put, Title 24 is the energy standard requirement for the state of California. It covers everything from the building materials to use, plumbing, water pressure, insulation, and more. It’s a broad reaching document that touches on anything that has to do with energy usage. This not only applies to buildings, but to parking canopies (AKA carports) as well.
Learn more about how we treat carports.
At Sepi, we manage the solar and the lighting requirements of Title 24. Although not every building needs to have solar to be Title 24 compliant, they do need to be “solar ready.” So, even if a building won’t have a solar system, it needs to be designed in a way that could accommodate one in the future. There are ways to do this cost-efficiently and many more ways to do this cost-inefficiently. Guess which approach we prefer to take?
According to Title 24, “solar ready” is essentially defined as a building that has a panel with a breaker that can accept PV. As you can see, this is a bit vague. Title 24 does address system sizing, energy production, interconnection, labeling, and a few other technical aspects, but it still leaves a lot to be interpreted. Because of this, we’re able to recommend a custom solution that best meets your building’s unique needs.
It’s also important to note that all newly-built California homes will require solar photovoltaic (PV) installations, which of course, is more expensive than simply being solar ready. Despite this requirement, we’ve been able to comply successfully with Title 24 in a few instances without solar PV. In these cases, the homeowner only needed to meet the “solar ready” provision, and this is because we discovered more efficient appliances and lighting fixtures to address Title 24.
Although energy efficient appliances are more expensive, they’re still less costly than a full solar system. When we can achieve Title 24 compliance without solar PV, we’re able to save homeowners as much as $30K from not having to build a new system.It’s no surprise that making mistakes can lead to expensive issues down the line. Because of this, a major benefit of working with a solar subcontractor is the ability to mitigate pitfalls before they happen. In our experience, these are some of the most common issues we see – all of which can be prevented by bringing in a solar subcontractor earlier on.
When this happens, we need to figure out the homeowner’s future load, extrapolate a PV system size, and then design the roof mounting locations based on that size. Sometimes, we even need to do all of this in as little as three weeks before the roofer arrives. We’ll always make sure to get you exactly what you need, but this is a stressful situation you probably won’t want to deal with. So, to save yourself time, money, and headaches, don’t forget to install your stanchions and stand-offs early on.